A kitchen without surprises: a checklist before you order
Before signing an offer, check the appliances, installations, materials, hardware and scope of installation. Clear preparation prevents most extra costs.
Kitchens
·

Most problems with a new kitchen don't start in the workshop, but before production begins: in an unclear quote, the wrong order of decisions or a measurement taken too early. A short check before signing the quote saves both money and time.
The quote has to be comparable
Comparing only the total price isn't enough. Ask for the exact names of materials, thicknesses, hardware types, the worktop model and a list of services. Anything that isn't written down can easily become an extra cost.
What to check before signing
Appliances - the exact models and dimensions of the oven, fridge, dishwasher and extractor hood.
Installations - the position of water, drainage, electricity and ventilation matched to the layout of the units.
Materials - the name and thickness of the boards, the type of fronts, the worktop and the finish.
Hardware - the manufacturer and series of hinges, runners and lift-up mechanisms.
Scope of service - delivery, installation, connecting appliances and finishing trims.

The order of decisions matters
Appliances are chosen before the technical design, installations follow the approved layout, and the final measurement comes after the walls and floor are finished. The sink, tap and lighting must have known dimensions before production.
Deadlines and changes
The quote should state the production and installation time, and the point from which it is counted - from signing, from the final measurement or from approval of the design. The deadline should also include time for checking the design, not just work in the workshop. How changes after signing are recorded should also be agreed in advance.
Questions about installation
Before signing, it is worth asking who does the installation, how long it takes and what needs to be prepared in the space. It is also good to know who connects the appliances, sink and lighting, and whether fronts and drawers can be readjusted after the first few weeks of use.
Clear preparation, smooth installation
A good maker openly explains the limitations and records the changes. Clear communication is the best protection against improvisation during installation.